400 NORTH ROAD over MAIN NORTHSIDE CANAL
0.6 N. 2.8 E. ACEQUIA · County 067, Idaho · Built 1998 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.677239, -113.548836
This bridge is in worse condition than 34.3% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 28 years old.
Nearby Bridges
790N-1350E over MAIN SOUTHSIDE CANAL
Built 1980
F STREET over MAIN NORTHSIDE CANAL
Built 1960
SH 24 over B-1 CANAL
Built 1972
STC2866;300 N. RD. over MAIN NORTHSIDE CANAL
Built 2001
200 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1973
400 North Road over Main Northside Canal
Built 1980
300 EAST ROAD over A CANAL
Built 1973
648 N 1250 E over MAIN SOUTHSIDE CANAL
Built 2011
STC2866;300 N. RD. over MAIN NORTHSIDE CANAL
Built 1979
100 NORTH ROAD over A-1 CANAL
Built 1974
Bridge Details
- Structure #
- 000000000025241
- Year Built
- 1998
- Length
- 38.4 m (126 ft)
- Max Span
- 7.3 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.