US 95 over GOLDEN GATE CANAL
WILDER SCL · County 027, Idaho · Built 1956 · 4 Lanes · 7,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.671897, -116.911922
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 70 years old.
Nearby Bridges
STC 3839;BATT CRNR over GOLDEN GATE CANAL
Built 2000
SH 19 over GOLDEN GATE CANAL
Built 1976
STC3798;PECKHAM RD over GOLDEN GATE CANAL
Built 1990
STC 3031;FARGO RD over GOLDEN GATE CANAL
Built 1991
TRAVIS ROAD over GOLDEN GATE CANAL
Built 1990
PENNY LANE over GOLDEN GATE CANAL
Built 1935
STC 3790;ALLENDALE over GOLDEN GATE CANAL
Built 1992
SMA3748;USTICK RD over DEER FLAT CANAL
Built 1998
FERN LANE over GOLDEN GATE CANAL
Built 1970
BOEHNER ROAD over DEER FLAT CANAL
Built 1993
Bridge Details
- Structure #
- 000000000018055
- Year Built
- 1956
- Length
- 7.4 m (24.3 ft)
- Max Span
- 6.7 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 4
- Daily Traffic
- 7,200
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $288,000
- Total Project Cost
- $316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.