STC 3790;ALLENDALE over GOLDEN GATE CANAL

0.6 S. 2.0 E. WILDER · County 027, Idaho · Built 1992 · 2 Lanes · 240 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000027216
Year Built
1992
Length
9.8 m (32.2 ft)
Max Span
4.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
240
Material
Concrete
Design
Channel Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.