FERN LANE over GOLDEN GATE CANAL

1.5 N. 1.2 W. WILDER · County 027, Idaho · Built 1970 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000027165
Year Built
1970
Length
7.3 m (24 ft)
Max Span
7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$189,000
Total Project Cost
$284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.