I 84 WBL over I 84B;UPRR;HEYBURN IC
2.5 E. BURLEY · County 067, Idaho · Built 1961 · 2 Lanes · 10,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.568889, -113.736467
This bridge is in worse condition than 34.3% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 65 years old.
Nearby Bridges
I 84 EBL over I 84B;UPRR;HEYBURN IC
Built 1961
500 WEST ROAD over I 84;500 WEST RD GS
Built 1961
300 WEST ROAD over B-4 CANAL
Built 1968
200 WEST ROAD over I 84;200 WEST RD GS
Built 1990
200 WEST ROAD over A CANAL
Built 2020
200 S 275 W over B-4 CANAL
Built 2023
I 84B SBL over SNAKE RIVER;HEYBURN BR.
Built 1977
I 84B NBL over SNAKE RIVER;HEYBURN BR.
Built 1955
500 SOUTH ROAD over A-5 CANAL
Built 2020
400 S. ROAD over A-5 CANAL
Built 2016
Bridge Details
- Structure #
- 000000000016365
- Year Built
- 1961
- Reconstructed
- 1980
- Length
- 206.7 m (678.1 ft)
- Max Span
- 26.2 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 10,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,886,000
- Total Project Cost
- $7,329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.