I 84B NBL over SNAKE RIVER;HEYBURN BR.

AT BURLEY NCL · County 031, Idaho · Built 1955 · 2 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000013670
Year Built
1955
Reconstructed
1978
Length
400.2 m (1313 ft)
Max Span
12.2 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
15,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,543,000
Total Project Cost
$17,315,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.