E 100 S over G CANAL;E.BURLEY BR
1.4S 1.0E BURLEY;100E100S · County 031, Idaho · Built 1976 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.518303, -113.773967
This bridge is in worse condition than 21.4% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 50 years old.
Nearby Bridges
STC7632;HILAND AVE over G CANAL
Built 1973
150 EAST ROAD over G CANAL
Built 2001
E 100 S over G CANAL
Built 1975
STC 7552;PARK AVE over G CANAL
Built 1983
STC 2838;250 EAST over G CANAL (UNITY BR)
Built 2006
I 84B NBL over SNAKE RIVER;HEYBURN BR.
Built 1955
I 84B SBL over SNAKE RIVER;HEYBURN BR.
Built 1977
50 WEST ROAD over H CANAL
Built 1989
S 100 W over H CANAL
Built 1983
350 EAST ROAD over G CANAL
Built 1986
Bridge Details
- Structure #
- 000000000024035
- Year Built
- 1976
- Length
- 8.3 m (27.2 ft)
- Max Span
- 8.3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $260,000
- Total Project Cost
- $390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.