300 WEST ROAD over B-4 CANAL

1.1 S. 3.0 E. PAUL · County 067, Idaho · Built 1968 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000025280
Year Built
1968
Reconstructed
2015
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$274,000
Total Project Cost
$411,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.