SH 41 SB over UPRR MAINLINE
1.5 N. POST FALLS · County 055, Idaho · Built 2022 · 2 Lanes · 7,750 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.766167, -116.894222
This bridge is in worse condition than 6.9% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 4 years old.
Nearby Bridges
SH 41 NB over UPRR MAINLINE
Built 2022
SH 41 over BURLINGTON NORTHERN RR
Built 2014
I 90 EBL over I 90 EB OFF RAMP
Built 2023
I 90 WBL over I 90 EB OFF RAMP
Built 2024
I 90 WBL over SH 41
Built 2024
I 90 EBL over SH 41
Built 2023
I 90 WBL over I 90 EB ON RAMP
Built 2024
I 90 WBL over SH 41;SH 41 IC
Built 1971
I 90 EBL over I 90 EB ON RAMP
Built 2023
I 90 WBL over SH 41
Built 2024
Bridge Details
- Structure #
- 000000000014248
- Year Built
- 2022
- Length
- 43 m (141.1 ft)
- Max Span
- 41.8 m
- Width
- 16.7 m (54.8 ft)
- Lanes
- 2
- Daily Traffic
- 7,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.