SH 28 over LEMHI RIVER

5.5 S. SALMON · County 059, Idaho · Built 2001 · 2 Lanes · 1,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000013446
Year Built
2001
Length
26.8 m (87.9 ft)
Max Span
25.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$1,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.