US 93 over SALMON RIVER;SALMON BR.

AT SALMON · County 059, Idaho · Built 1926 · 2 Lanes · 7,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000017885
Year Built
1926
Reconstructed
1964
Length
133.5 m (438 ft)
Max Span
23.8 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
7,300
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,009,000
Total Project Cost
$7,514,000