BACK ROAD over WIMPEY CREEK
10.4 SE SALMON · County 059, Idaho · Built 2013 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
45.097806, -113.720111
This bridge is in worse condition than 8.8% of bridges in County 059. The average bridge in Idaho is 0 years old; this one is 13 years old.
Nearby Bridges
N. BAKER ROAD over LEMHI RIVER (BAKER BR)
Built 1977
SH 28 over LEMHI RIVER
Built 2018
BACK RD; OLD LEMHI over PRATT CREEK (#1)
Built 2018
PRATT CREEK ROAD over PRATT CREEK
Built 2015
SH 28 over LEMHI RIVER
Built 2001
BARRACKS LANE over LEMHI RIVER
Built 1930
SH 28 over LEMHI RIVER
Built 2001
SH 28 over LEMHI RIVER
Built 2001
17 MILE LANE over LEMHI RIVER;17 MILE BR
Built 1977
OLD HWY 28;BACK RD over KENNY CREEK
Built 2012
Bridge Details
- Structure #
- 000000000032708
- Year Built
- 2013
- Length
- 13.4 m (44 ft)
- Max Span
- 12.8 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.