I 15 SBL over STC 1762;PORTNEUF RD IC
3.6 S. POCATELLO · County 005, Idaho · Built 1963 · 2 Lanes · 9,750 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.798756, -112.363369
This bridge is in worse condition than 72.7% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
I 15 NBL over STC 1762;PORTNEUF RD IC
Built 1963
STC1762;PRTNEUF RD over PORTNEUF R;FT HALL MINE
Built 1983
I 15 SBL over BLACKROCK RD.GS
Built 1965
I 15 NBL over BLACKROCK RD.GS
Built 1965
W BLACKROCK ROAD over PORTNEUF R;NW.INKOM BR
Built 1948
I 15 NBL over SMA 5697;SOUTH VALLEY RD
Built 2015
I 15 SBL over SMA 5697;SOUTH VALLEY RD
Built 2015
SMA7217;S. VALLEY over AMI TRAIL
Built 2016
SMA7217;S. VALLEY over S 2ND;PORTNEUF R;UPRR
Built 2016
I 15 NBL over I 15B;S.POCATELLO IC
Built 1965
Bridge Details
- Structure #
- 000000000011210
- Year Built
- 1963
- Length
- 50.3 m (165 ft)
- Max Span
- 16.2 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 9,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,372,000
- Total Project Cost
- $2,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.