I 15 NBL over STC 1762;PORTNEUF RD IC

3.6 S. POCATELLO · County 005, Idaho · Built 1963 · 2 Lanes · 9,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000011205
Year Built
1963
Length
50.3 m (165 ft)
Max Span
16.2 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
9,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,372,000
Total Project Cost
$2,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.