I 15 NBL over I 15B;S.POCATELLO IC
2.6 S. POCATELLO · County 005, Idaho · Built 1965 · 2 Lanes · 10,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.839681, -112.410519
This bridge is in worse condition than 38.3% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
I 15 SBL over I 15B;S.POCATELLO IC
Built 1965
I 15 SBL over SMA 5697;SOUTH VALLEY RD
Built 2015
SMA7217;S. VALLEY over AMI TRAIL
Built 2016
I 15 NBL over SMA 5697;SOUTH VALLEY RD
Built 2015
SMA7217;S. VALLEY over S 2ND;PORTNEUF R;UPRR
Built 2016
I 15 NBL over BARTON RD.GS
Built 1964
I 15 SBL over BARTON RD.GS
Built 1964
STP 7391;S. MAIN over PORTNEUF RIVER
Built 1967
I 15 NBL over SMA 7461;E. TERRY ST
Built 1964
I 15 SBL over SMA 7461;E. TERRY ST
Built 1964
Bridge Details
- Structure #
- 000000000011225
- Year Built
- 1965
- Length
- 85.6 m (280.8 ft)
- Max Span
- 22.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 10,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,141,000
- Total Project Cost
- $3,212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.