STP 7391;S. MAIN over PORTNEUF RIVER

2.0 S. POCATELLO · County 005, Idaho · Built 1967 · 2 Lanes · 6,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021515
Year Built
1967
Length
35.7 m (117.1 ft)
Max Span
12.2 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
6,500
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,500,000
Total Project Cost
$2,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.