SH 8 over RUBY CREEK

5.6 SE. BOVILL · County 035, Idaho · Built 1976 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000010260
Year Built
1976
Length
74.7 m (245.1 ft)
Max Span
26.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.