SH 8 over W.FK.POTLATCH RIVER

0.1 W. BOVILL · County 057, Idaho · Built 1958 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000010250
Year Built
1958
Length
15.8 m (51.8 ft)
Max Span
15.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$579,000
Total Project Cost
$869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.