SH 8 over W.FK.POTLATCH RIVER
0.1 W. BOVILL · County 057, Idaho · Built 1958 · 2 Lanes · 1,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.857128, -116.400086
This bridge is in worse condition than 46.2% of bridges in County 057. The average bridge in Idaho is 0 years old; this one is 68 years old.
Nearby Bridges
SH 8 over E.FK.POTLATCH CREEK
Built 1955
SH 3 over W. FK. POTLATCH RIVER
Built 2020
NO DATA ENTERED over NO DATA ENTERED
Built 2017
FORKS ROAD over POTLATCH R;E.HELMER BR
Built 1977
FDR 377D over W FK POTLATCH CREEK
Built 1981
SH 8 over RUBY CREEK
Built 1976
PARK ROAD; NF-1963 over HOG MEADOW CREEK
Built 1973
PARK ROAD over POTLATCH RIVER
Built 2018
SH 9 over E.FK.BEAR CREEK
Built 1982
MICA MTN. ROAD over WIRR(NW DEARY OP) PATH
Built 2024
Bridge Details
- Structure #
- 000000000010250
- Year Built
- 1958
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.2 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $579,000
- Total Project Cost
- $869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.