SH 3 over W. FK. POTLATCH RIVER

3.5 N. BOVILL · County 057, Idaho · Built 2020 · 2 Lanes · 460 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010081
Year Built
2020
Length
14 m (45.9 ft)
Max Span
13.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
460
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.