PALI HWY over PALI BR 3 IB(PARTL)
0.34MI NE/PALI LKOT RD · County 003, Hawaii · Built 1956 · 2 Lanes · 42,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
21.367669, -157.791675
This bridge is in worse condition than 49.3% of bridges in County 003. The average bridge in Hawaii is 0 years old; this one is 70 years old.
Nearby Bridges
PALI HWY over PALI BR 2 IB(PARTL)
Built 1956
PALI HWY over PALI BR 1 IB(PARTL)
Built 1956
H3 FRWY/RAMP over SERVICE ROAD
Built 1988
PALI HWY over PALI BR 4A OB(PARTL)
Built 1961
PALI HWY over PALI BR 4B OB(PARTL)
Built 1961
RT 61 (PALI HWY) over PALI BR 4 IB
Built 1956
PALI HWY over MOUNTAIN (PALI BR NO 4C)
Built 1961
PALI HWY over PALI BR 5A OB
Built 1961
PALI HWY over PALI BR 5 IB
Built 1956
PALI HWY over PALI BR #6 IB
Built 1956
Bridge Details
- Structure #
- 003000610300593
- Year Built
- 1956
- Length
- 32.9 m (107.9 ft)
- Max Span
- 17.4 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 42,100
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.