PALI HWY over MOUNTAIN (PALI BR NO 4C)
0.605MI NE/PALI LKOT RD · County 003, Hawaii · Built 1961 · 2 Lanes · 42,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
21.368758, -157.787953
This bridge is in worse condition than 49.3% of bridges in County 003. The average bridge in Hawaii is 0 years old; this one is 65 years old.
Nearby Bridges
RT 61 (PALI HWY) over PALI BR 4 IB
Built 1956
PALI HWY over PALI BR 4B OB(PARTL)
Built 1961
PALI HWY over PALI BR 4A OB(PARTL)
Built 1961
PALI HWY over PALI BR 5A OB
Built 1961
PALI HWY over PALI BR 5 IB
Built 1956
PALI HWY over PALI BR #6 IB
Built 1956
PALI HWY over PALI BR #7A OB
Built 1961
PALI HWY over PALI BR #7 IB
Built 1956
PALI HWY over PALI BR #8 IB
Built 1956
PALI HWY over PALI BR #8A OB
Built 1961
Bridge Details
- Structure #
- 003000610300619
- Year Built
- 1961
- Length
- 22.6 m (74.1 ft)
- Max Span
- 8.2 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 42,100
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.