PALI HWY over PALI BR 5A OB
0.64MI NE/PALI LKOT RD · County 003, Hawaii · Built 1961 · 2 Lanes · 42,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
21.369342, -157.787097
This bridge is in worse condition than 49.3% of bridges in County 003. The average bridge in Hawaii is 0 years old; this one is 65 years old.
Nearby Bridges
PALI HWY over PALI BR 5 IB
Built 1956
PALI HWY over PALI BR #6 IB
Built 1956
PALI HWY over MOUNTAIN (PALI BR NO 4C)
Built 1961
RT 61 (PALI HWY) over PALI BR 4 IB
Built 1956
PALI HWY over PALI BR #7A OB
Built 1961
PALI HWY over PALI BR 4B OB(PARTL)
Built 1961
PALI HWY over PALI BR #7 IB
Built 1956
PALI HWY over PALI BR 4A OB(PARTL)
Built 1961
PALI HWY over PALI BR #8 IB
Built 1956
PALI HWY over PALI BR #8A OB
Built 1961
Bridge Details
- Structure #
- 003000610300623
- Year Built
- 1961
- Length
- 63.6 m (208.7 ft)
- Max Span
- 30.5 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 42,100
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $891,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.