DMPRC LTRAIL 5A over BONHAM CREEK

.25 MILES SE N2006 · County 053, Georgia · Built 2008 · 2 Lanes · 25 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
DAPTRABEN0N2007
Year Built
2008
Length
6.7 m (22 ft)
Max Span
6.7 m
Width
27.4 m (89.9 ft)
Lanes
2
Daily Traffic
25
Material
Steel
Design
Arch - Deck
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.