FALL LINE FWY (SBL over CR 21 NS RR

5.3 MILES N.E. OF GORDON · County 319, Georgia · Built 2010 · 2 Lanes · 2,702 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031950360
Year Built
2010
Length
67.7 m (222.1 ft)
Max Span
35.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,702
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$867,000
Total Project Cost
$1,301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.