FALL LINE FWY(SBL) over BLACK CREEK

7.5 MILES N.E. OF GORDON · County 319, Georgia · Built 2010 · 2 Lanes · 2,702 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000031950380
Year Built
2010
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,702
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.