FALL LINE FREEWAY over LAKE TCHUKOLAKO
CITY OF IVEY · County 319, Georgia · Built 1961 · 5 Lanes · 7,730 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.904417, -83.298586
This bridge is in worse condition than 34.7% of bridges in County 319. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
JACKSON ROAD over BEAVER CREEK
Built 1960
FALL LINE FWY(SBL) over BEAVER CREEK
Built 2009
FALL LINE FWY(NBL) over BEAVER CREEK
Built 2010
OWENS SHEPARD ROAD over LITTLE COMMISSIONER CR
Built 1959
FALL LINE FWY (NBL over CR 21 NS RR
Built 2010
FALL LINE FWY (SBL over CR 21 NS RR
Built 2010
SR 18 SPUR over FRAZIER CREEK
Built 1936
SR 18 over CS 44-NOR-SOU RR 732712X
Built 1947
SR 18 over LITTLE COMMISSIONERS CK
Built 1989
JACKSON ROAD over LORDS BRANCH
Built 1960
Bridge Details
- Structure #
- 000000031900260
- Year Built
- 1961
- Reconstructed
- 2010
- Length
- 97.5 m (319.9 ft)
- Max Span
- 12.2 m
- Width
- 24.5 m (80.4 ft)
- Lanes
- 5
- Daily Traffic
- 7,730
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,273,000
- Total Project Cost
- $3,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.