FALL LINE FREEWAY over LAKE TCHUKOLAKO

CITY OF IVEY · County 319, Georgia · Built 1961 · 5 Lanes · 7,730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031900260
Year Built
1961
Reconstructed
2010
Length
97.5 m (319.9 ft)
Max Span
12.2 m
Width
24.5 m (80.4 ft)
Lanes
5
Daily Traffic
7,730
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,273,000
Total Project Cost
$3,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.