SR 18 over CS 44-NOR-SOU RR 732712X

CITY OF GORDON · County 319, Georgia · Built 1947 · 2 Lanes · 1,430 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000031900040
Year Built
1947
Length
106.4 m (349.1 ft)
Max Span
16.2 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
1,430
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,364,000
Total Project Cost
$2,045,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.