KIA PARKWAY over LONG CANE CREEK

1 MI NE OF WEST POINT · County 285, Georgia · Built 2008 · 4 Lanes · 1,081 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000028550700
Year Built
2008
Length
91.4 m (299.9 ft)
Max Span
30.5 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
1,081
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,812,000
Total Project Cost
$2,717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.