I-85 (SBL) over LONG CANE CREEK

IN WEST POINT · County 285, Georgia · Built 1963 · 3 Lanes · 44,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028500500
Year Built
1963
Reconstructed
1983
Length
95.1 m (312 ft)
Max Span
11.9 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
44,900
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,552,000
Total Project Cost
$2,327,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.