I-85 (NBL) over SR 18

IN WEST POINT · County 285, Georgia · Built 1963 · 2 Lanes · 36,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028500510
Year Built
1963
Reconstructed
1983
Length
55.8 m (183.1 ft)
Max Span
15.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
36,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$715,000
Total Project Cost
$1,073,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.