N. MAIN STREET over SR 130

0.22 MILES NW OF VIDALIA · County 279, Georgia · Built 1992 · 2 Lanes · 290 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000027900560
Year Built
1992
Length
20.4 m (66.9 ft)
Max Span
20.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
290
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$262,000
Total Project Cost
$393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.