THOMPSON POND RD over SWIFT CREEK TRIB.

2.3 MI N OF VIDALIA · County 279, Georgia · Built 1948 · 2 Lanes · 2,290 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000027900450
Year Built
1948
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
2,290
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.