THOMPSON POND RD over SWIFT CREEK

2.2 MI N OF VIDALIA · County 279, Georgia · Built 1948 · 2 Lanes · 2,290 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000027900440
Year Built
1948
Reconstructed
2001
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
2,290
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$391,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.