OZELL ROAD over AUCILLA RIVER TRIB

8 M NE OF THOMASVILLE · County 275, Georgia · Built 1978 · 2 Lanes · 660 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027550230
Year Built
1978
Reconstructed
2003
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
660
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.