COFFEE ROAD over LOST CREEK

7.5 MI W OF BARWICK · County 275, Georgia · Built 2017 · 2 Lanes · 970 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027551700
Year Built
2017
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
970
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,328,000
Total Project Cost
$7,992,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.