SUMMER HILL ROAD over MASSE BRANCH
APP 3.5 MI NW OF BOSTON · County 275, Georgia · Built 1981 · 2 Lanes · 350 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.833672, -83.823186
This bridge is in worse condition than 30.7% of bridges in County 275. The average bridge in Georgia is 0 years old; this one is 45 years old.
Nearby Bridges
SALLY ROAD over MASSE BRANCH
Built 1942
US 84/SR38 over MASSE CREEK
Built 1942
OLD QUITMAN ROAD over MASSE BRANCH TRIB
Built 1978
SUMMER HILL ROAD over AUCILLA RIVER
Built 1990
US 84/ SR38 over AUCTILLA RIVER
Built 1942
BOSTON-FIVE FORKS over MASSE CREEK TRIBUTARY
Built 1998
US 84/SR38 over AUCILLA RIVER OVERFLOW
Built 1942
US 84/SR38 over AUCILLA RIVER OVERFLOW
Built 1942
US 84/ SR38 over AUCILLA RIVER OVERFLOW
Built 1942
OZELL ROAD over AUCILLA RIVER TRIB
Built 1978
Bridge Details
- Structure #
- 000000027550200
- Year Built
- 1981
- Length
- 12.8 m (42 ft)
- Max Span
- 6.4 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $164,000
- Total Project Cost
- $246,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.