US 19 SBL / SR 3 over CSX RR
9 MI. SOUTH BUTLER · County 269, Georgia · Built 2006 · 2 Lanes · 1,520 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.439208, -84.276969
This bridge is in worse condition than 37.1% of bridges in County 269. The average bridge in Georgia is 0 years old; this one is 20 years old.
Nearby Bridges
US 19 NBL / SR 3 over CSX RR
Built 2006
J. RAN COOPER ROAD over CSX RAILROAD
Built 1973
US 19 SR 3 over RAMULETTE CREEK
Built 2008
US 19 over RAMBULETTE CREEK.
Built 2006
THAXTON RD. over RAMBULETTE CREE
Built 2001
US 19 over WHITEWATER CREEK.
Built 2006
US 19 / SR 3 over WHITEWATER CREEK.
Built 2008
SR 127 over WHITEWATER CREEK
Built 1964
PROSPERITY CH ROAD over CEDAR CREEK
Built 2023
US 19 / SR 3 over CEDAR CREEK TRIB
Built 2006
Bridge Details
- Structure #
- 000000026950420
- Year Built
- 2006
- Length
- 101.8 m (334 ft)
- Max Span
- 30.8 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,520
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,305,000
- Total Project Cost
- $1,958,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.