PROSPERITY CH ROAD over CEDAR CREEK

3.5 MI S OF RUPERT · County 269, Georgia · Built 2023 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000026950570
Year Built
2023
Length
48.8 m (160.1 ft)
Max Span
15.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$14,208,000
Total Project Cost
$14,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.