US 19 / SR 3 over WHITEWATER CREEK.

5.5 MI. S OF BUTLER · County 269, Georgia · Built 2008 · 2 Lanes · 1,520 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000026950500
Year Built
2008
Length
115.8 m (379.9 ft)
Max Span
30.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,520
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,485,000
Total Project Cost
$2,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.