US 19 / SR 3 over HEART OF GEORGIA RR

0.5 MI SOUTH OF AMERICUS · County 261, Georgia · Built 2009 · 4 Lanes · 6,070 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000026150570
Year Built
2009
Length
54.9 m (180.1 ft)
Max Span
21.3 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
6,070
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,087,000
Total Project Cost
$1,630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.