S. LEE STREET over HEART OF GA R/R

IN AMERICUS · County 261, Georgia · Built 2024 · 2 Lanes · 8,640 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000026150640
Year Built
2024
Length
16.8 m (55.1 ft)
Max Span
7.6 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
8,640
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,884,000
Total Project Cost
$7,326,000