US 280 FORSYTH ST over NS RAILROAD

IN W AMERICUS · County 261, Georgia · Built 1988 · 2 Lanes · 17,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000026100510
Year Built
1988
Length
65.8 m (215.9 ft)
Max Span
33.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
17,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$844,000
Total Project Cost
$1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.