BERCKMAN ROAD over RAES CREEK

12.9 MI NE OF HEPHIZIBAH · County 245, Georgia · Built 2020 · 3 Lanes · 9,410 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000024550990
Year Built
2020
Length
31.4 m (103 ft)
Width
21.2 m (69.6 ft)
Lanes
3
Daily Traffic
9,410
Material
Prestressed Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$9,176,000
Total Project Cost
$13,764,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.