SR 56 over SPIRIT CREEK

8.2 MI E OF HEPHZIBAH · County 245, Georgia · Built 2015 · 4 Lanes · 16,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000024550900
Year Built
2015
Length
54.9 m (180.1 ft)
Max Span
13.7 m
Width
32.1 m (105.3 ft)
Lanes
4
Daily Traffic
16,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,984,000
Total Project Cost
$23,976,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.