I-520 (EBL) over BEAVERDAM DITCH

10.5 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1998 · 2 Lanes · 29,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000024550510
Year Built
1998
Length
57.9 m (190 ft)
Max Span
21.9 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
29,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$742,000
Total Project Cost
$1,114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.