SR 104 over RAES CREEK

13.8 MI N OF HEPHZIBAH · County 245, Georgia · Built 1990 · 4 Lanes · 25,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024501230
Year Built
1990
Length
106.7 m (350.1 ft)
Max Span
26.8 m
Width
24.9 m (81.7 ft)
Lanes
4
Daily Traffic
25,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,113,000
Total Project Cost
$3,170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.