EVE STREET over AUGUSTA CANAL

13.2 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1975 · 2 Lanes · 2,130 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024550210
Year Built
1975
Length
61 m (200.1 ft)
Max Span
30.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,130
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.