I-520 over SR 121 (US 25)

7.5 MI N OF HEPHZIBAH · County 245, Georgia · Built 1981 · 5 Lanes · 46,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024500640
Year Built
1981
Length
80.5 m (264.1 ft)
Max Span
42.7 m
Width
38.8 m (127.3 ft)
Lanes
5
Daily Traffic
46,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,875,000
Total Project Cost
$2,813,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.