SR 56 over ROCKY CREEK

9 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1959 · 5 Lanes · 11,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024500340
Year Built
1959
Reconstructed
1968
Length
25.6 m (84 ft)
Max Span
8.5 m
Width
18.7 m (61.4 ft)
Lanes
5
Daily Traffic
11,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$597,000
Total Project Cost
$895,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.