US 25 BUS. over SAVANNAH RIVER

@THE S CAROLINA ST LINE · County 245, Georgia · Built 1939 · 4 Lanes · 23,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000024500090
Year Built
1939
Reconstructed
1991
Length
459.3 m (1506.9 ft)
Max Span
38.1 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
23,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,100,000
Total Project Cost
$13,650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.